Answer:
Output/Input (APEX) <--------
Explanation:
This is the <u>CORRECT</u> answer for APEX.
Answer:
From this information one can conclude that last period the variable overhead efficiency (quantity) variance was <u>unfavorable.</u>
Explanation:
The variable overhead efficiency variance measures the difference between the actual and budgeted hours worked with respect to standard variable overhead rate per hour.
Variable overhead efficiency variance can be calculated thus:
Actual labor hours less budgeted labor hours x Hourly rate for standard variable overhead
If the time it takes to manufacture a product and the time budgeted for it matches or performs well, the labor efficiency is favorable.
Variable overhead efficiency variance is deemed unfavorable when it takes the company more time than budgeted to produce. This also shows labor efficiency variance was unfavorable.
Three essential <span>principles of test construction are:
1. consistency. It refers to the consistency </span><span>between the goal of the subject, course, and the methods of teaching goals. Also consistency between the methods and what the test measures. </span><span>
2. validity. Validity refers to t</span>he ability of a test to measure what it was designed to measure. It can be material od skill.
3. reliability. The <span>test must be constructed in such a way that it will produce reliable, consistent results .</span>
Answer:
Cashflow from Operating Activities $
Net income 61,000
Add: items not involving movement of cash
Depreciation <u>76,000</u>
137,000
Changes in working capital:
Increase in prepaid rent (56,000)
Increase in accounts payable <u>11,000</u>
92,000
Less: Tax <u> 16,000</u>
Cashflow from operating activities <u> 76,000</u>
Explanation:
Cashflow from operaing activities using the indirect method equals net income plus depreciation minus increase in prepaid rent plus increase in accounts payable minus tax.
Answer:
total opportunity cost is $44
Explanation:
given data
parking fee = $4
earn = $10 per hour
time = 4 hour
to find out
opportunity cost
solution
we first find 4 hour earning that is
earning = earn × time
earning = 10 × 4
earning in 4 hours = $40
and
saving = $4
so total opportunity cost = saving + earning
total opportunity cost = $4 + $40
so total opportunity cost is $44