Answer:
3
Step-by-step explanation:
9-7=2
2*3=6
6*2=12
75/5=15
15-12=3
Answer:
A function that gives the work required in foot-lbs to lift the bucket up x feet from the ground is
and the work to get the bucket to the top of the cliff is 3726 foot-lbs
Step-by-step explanation:
Work done to lift the rope by distance x feet:

Work done to lift the bucket by distance x feet:

On reaching top 7 gallons of water spilled out so , on going up by x feet
gallons of water spilled out.
a function that gives the work required in foot-lbs to lift the bucket up x feet from the ground:

Now the work to get the bucket to the top of the cliff i.e. x =35

W=3726
Hence, a function that gives the work required in foot-lbs to lift the bucket up x feet from the ground is
and the work to get the bucket to the top of the cliff is 3726 foot-lbs
Because anything multiplied by one is that number. If you have 3/4 one time, then it is 3/4.
Aacanding th the title a tite sic is 7R t Cz4
78t1-341=78-34=44 iThe iome is psitive aad the withdraual is
regative
so the sum TRIc-3) is mean the situation of the Gearge's acount
after the two transactions today
Gerge is bank account cared 44 today
F=v+at
f-v=at
(f-v)/t =a
the first choice is correct :)