1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Zigmanuir [339]
3 years ago
10

When attempting to do his homework, Mark incorrectly uses the addition property of equality below. Which

Mathematics
1 answer:
VikaD [51]3 years ago
8 0
The correct answer is b
You might be interested in
The table shows the number of yards a football player runs in each quarter of a game. Find the mean number of yards the player r
Art [367]
Show the pic of the table
7 0
4 years ago
Evaluate: x(y - xy), where x = -5 and y= -2
yulyashka [42]

Answer:

60

Step-by-step explanation:

You would just plug everything in so you get -5(-2-(-5)(-2)) which can be reduced so -5(-12) which is 60

5 0
3 years ago
Can someone give me the answer to this?
balu736 [363]

\frac{FI}{IG}=\frac{14}{28}=\frac{1}{2}\\\\\frac{FE}{EH}=\frac{12}{26}=\frac{6}{13}

So, IE is not parallel to GH.

4 0
2 years ago
A child pushes a toy car with a force of
ehidna [41]

The work is done on the toy car is 164.4 J .

<h3>How to calculate work done?</h3>

We are aware that the definition of work is the multiplication of the magnitude of the displacement (d) and the component of the force acting in the displacement direction.

When an object moves over a distance while being applied with force, the work is considered to have been completed.

Three categories can be used to classify the type of labor performed. Positive work, negative work, and zero work are the three types. The angle between force and displacement determines the kind of work that is done. Positive work is defined as any work that causes an object to move in the direction of the applied force.

Given ,

Work = force * distance

Force = 5.2 N

Distance = 32 m

So ,

Work = 5.2 * 32

= 166. 4 J

Therefore the work is done is 164.4 J

To learn more about work done refer to:

brainly.com/question/25816840

#SPJ1

6 0
1 year ago
Which of The following system of equations is solved, what would be the value of the Y coordinate?
Marat540 [252]
The answer would be D) -2
6 0
3 years ago
Read 2 more answers
Other questions:
  • A certain scale has an uncertainty of 4 g and a bias of 2 g. A single measurement is made on this scale. What are the bias and u
    7·1 answer
  • In the dryer there are 18 red socks, 24 white socks, 8 blue socks, and 10 black socks. Fred wants to have two matching socks to
    11·1 answer
  • Each day mr. samms randomly chooses 2 students from his class to serve as helpers. if there are 15 boys and 10 girls in the clas
    12·2 answers
  • What is the circumference of the circle? Assume pi = 3.14
    5·2 answers
  • What is the equation of the line whose slope is 20 and a y-intercept of 5
    5·1 answer
  • Can someone help on really stuck
    9·1 answer
  • Ana bought 3 gallons of milk last month at $3.30 per gallon and 3 gallons of milk at $3.20 per gallon this month.
    8·1 answer
  • Find the area of the figure. Round to the nearest hundredth.
    5·1 answer
  • A customer asked Crazy Dave to split a pie into sixths. This is what he did: Explain why he is wrong and show a correct way to d
    15·1 answer
  • Do these have the same horizontal asymptote or no?
    11·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!