15 - x = 2(x + 3)
15 - x = 2x + 6
15 = 3x + 6
9 = 3x
3 = x
x = 3
Answer:
Sheet metal remaining = 4.1x
cost per square foot of sheet metal = $30
Step-by-step explanation:
Total sheet metal bought = 7.6 ft2
Total sheet metal used = 3.5 ft2
Given equation:
7.6x − 3.5x = 123
Where,
x = cost per square foot
7.6x − 3.5x
Sheet metal remaining = 4.1x
7.6x − 3.5x = 123
4.1x = 123
x = 123 / 4.1
x = $30
Cost per square foot = $30
Answer:
373.8mmHg
Step-by-step explanation:
a =height (in km) above sea level,
the pressure P(a) (in mmHg) is approximated given as
P(a) = 760e–0.13a .
To determine the atmospheric pressure at 5.458 km, then we will input into the equation
P(5.458km) = 760e–0.13a .
= 760e^(-0.13×5.458)
=760e^-(0.70954)
= 760×0.4919
=373.8mmHg
Therefore, the atmospheric pressure at 5.458 km is 373.8mmHg