A=P(1+r/100)^n
A=500(1+4/400)^24
A=500(1.01)^24
A=634.87
A, B and C working together will finish same piece of work in 10 days
A can do a piece of work in 20 days. That is A is doing the work at a rate of 1 / 20. Therefore
B = 1 / 30
C = 1 / 60
A, B and C working togehter their rate will be added together =
A + B + C = 1 / 20 + 1 / 30 + 1 / 60 = 1 / 10
so they can work together to finish same piece of work in 10 days
Bruh it clearly says 65 mph so that’s the answer
Answer:
B) B(2,-3) and C(-2,3)
Step-by-step explanation:
The given point A, has coordinates (-2,-3).
When point A(-2,-3) is reflected over the y-axis to obtain point B, then the coordinates of B is obtained by negating the x-coordinate of A.
Therefore B will have coordinates (2,-3).
When point A(-2,-3) is reflected over the x-axis to obtain point C, then the coordinates of C is obtained by negating the y-coordinate of A.
Hence the coordinates of C are (-2,3)