Answer:
1)Area; A = ¼πr²
Perimeter; P = πr/2 + 2r
2)A = 19.63 cm²
P = 17.85 cm
3) r = 8.885 cm
4) r = 14 cm
Step-by-step explanation:
This is a quadrant of a circle. Thus;
Area of a circle is πr². A quadrant is a quarter of a circle. Thus;
Formula for Quadrant Area is; A = ¼πr²
A) Perimeter of a circle is 2πr. Thus, perimeter of a quadrant is a quarter of the full circle perimeter.
Formula for the quadrant perimeter in the image given is;
P = 2πr/4 + 2r
P = πr/2 + 2r
B) When r is 5 cm;
A = ¼π(5)²
A = 19.63 cm²
P = π(5)/2 + 2(5)
P = 17.85 cm
C) when A is 100cm²:
¼πr² = 100
r² = 100 × 4/π
r² = 78.9358
r = √78.9358
r = 8.885 cm
D) when P = 50 cm.
50 = πr/2 + 2r
50 = (½π + 2)r
r = 50/(½π + 2)
r = 14 cm
Your Answer should be True
The initial fee of $50 is essentially the y intercept because this is the value when x = 0 (x is the number of labor-hours). So b = 50.
The slope is m = 30 because each increase of 1 hour leads to the cost bumping up by 30 dollars. In other words, slope = rise/run = (change in cost)/(change in hours) = 30/1
So we plug m = 30 and b = 50 into the y = mx+b formula to get y = 30x+50
Replace y with f(x) to get f(x) = 30x+50
The linear function for the cost is f(x) = 30x+50
Note: Some books may use other letters (instead of x and f(x)), but the idea is still the same
Once you know the cost function, you replace x with 4.5 to find the amount it will cost to have a painter work for 4.5 hours.
f(x) = 30x+50
f(4.5) = 30*4.5+50
f(4.5) = 135+50
f(4.5) = 185
It will cost 185 dollars to have the painter work for 4.5 hours
2814÷7= 402.
hope this helps!
Answer:
3
x
2
X
−
10
x
X
+
8
X
+
g
Step-by-step explanation: