Answer:
Step-by-step explanation:
This operation would result in the "midpoint" of the line segment.
Answer:
12x=10(25+x)
Step-by-step explanation:
Jim's rate=x
Pete's rate=y
Jim and Pete lays the same number of tiles.
So we have,
12x=10y
Pete's can lay 25 more tiles than Jim per hour
We have
y=25+x
Substitute y=25+x into 12x=10y
12x=10y
12x=10(25+x)
12x=250+10x
12x-10x=250
2x=250
x=250/2
=125
x=125
12x=10(25+x) is the equation used to find the rate that Jim can lay tiles
Answer:
6 units left
8 units up
X - 6
Y + 8
Step-by-step explanation:
A' is the ending position.
A is the starting position.
Brainliest?
Answer:
$147
Step-by-step explanation:
378 / 18 = 21
1 hour of work = $21
7 hours of work = $21 * 7 = $147
Step-by-step explanation:
from what I can see there are 2 options to make the 2 triangles congruent :
either the opposite sides must be equal or the neighboring sides must be equal.
so, either
5x = 3x + 10
and
5x - 2 = 4x + 3
or
5x = 4x + 3
and
5x - 2 = 3x + 10
for the first
5x = 3x + 10
2x = 10
x = 5
control
5x - 2 = 4w + 3
5×5 - 2 = 4×5 + 3
23 = 23
correct.
for the second
5x = 4x + 3
x = 3
control
5×3 - 2 = 3×3 + 10
15 - 2 = 9 + 10
13 = 19
no, not a valid solution.
so, x = 5