Answer: 1692
Step-by-step explanation:
Formula to find the sample size :

Given : Confidence level : 
⇒ significance level =
z-value for 90% confidence interval (using z-table)=
Prior estimate of the population proportion (p) of customers who keep up with regular vehicle maintenance is unknown.
Let we take p= 0.5
Margin of error : E= 2%=0.02
Now, the required sample size will be :

Simplify , we get

Hence, the required sample size = 1692
Answer:
Height of the building = 50.8 ft
Step-by-step explanation:
A person and a building are casting the shadows at the same time of the day.
Triangles formed by the person and his shadow and the building and its shadow will be similar.
Therefore, corresponding sides of the similar triangles will be proportional.

x = 
x = 50.75
x ≈ 50.8 ft
First, isolate y on one side to find some information about the graph.
3x+4y=-10
4y=-10-3x
y=(-10-3x)/4
Now find out the x and y intercepts of this equation;
(0)=(-10-3x)/4
4x0=-10-3x
0=-10-3x
3x=-10
x=-10/3 or -3.3333 (x-intercept)
y=(-10-3(0))/4
4y=-10
y=-10/4 or -5/2 = -2.5 (y-intercept)
Plot these points onto your graph and connect the lines.
I have attached a graph below, I'm sorry I couldn't do it on paper.
Hope I helped :)
Hi there!

Evalute by substituting in 5 for x:
w(5) = 9(5) + 8
Simplify:
w(5) = 45 + 8 = 53
The confidence interval is

We first find p, our sample proportion. 118/200 = 0.59.
Next we find the z-score associated with this level of confidence:
Convert 98% to a decimal: 98% = 98/100 = 0.98
Subtract from 1: 1-0.98 = 0.02
Divide by 2: 0.02/2 = 0.01
Subtract from 1: 1-0.01 = 0.99
Using a z-table (http://www.z-table.com) we see that this value is associated with a z-score of 2.33.
The margin of error (ME) is given by

This gives us the confidence interval