Answer:
it aproximatley 7.937 rounded to the nearest tenth its 7.9
Step-by-step explanation:
k-4/3= 3
Mutiply both sides by 3 .
(3)(k-4/3)= (3)(3)
Cross out 3 and 3 , divide by 3 and then becomes k-4= 9
Move -4 to the other side
Sign changes from -4 to +4
k-4+4= 9+4
k= 13
Answer: k= 13
Answer: option d. C (0,3), D (0,5).
Justification:
1) The x - coordinates of the vertices A and B are shown in the diagrama, They are both - 4, so the new vertices C and D must be in a line parallel to y = - 4.
2) The y-coordinates of the vertices A and B are also shown in the diagrama. They are equal to 3 and 5 respectively.
3) We can see that the new points C and D must be over a parallel line to y = - 4 and that their distance to the points A and B has to be the same distance of the point R and S to U and T.
That distance is 4, so the line may be y = - 7 or y = 0.
4) If the line is y = 7 the points C and D would have coordinates (-7,3) and (-7,5), but this points are not among the options.
5) If the line is y = 0 the points C and D would have coordinates (0, 3) and (0,5), which is precisely the points of the option d. That is the answer.
The minimal completion time for the activities is the shortest possible time for all the activities to be finished. In doing this, we look at the path that would require the greatest amount of time. At the START node, we choose the path that would take the longest which is 7 days leading to ACTIVITY D. Next, we choose the path leading to ACTIVITY B which takes 5 days. Then, we move to ACTIVITY C taking 5 days and finally, reach the END which would take 6 days. So, the minimal completion time is:
7 + 5 + 5 + 6 = 23 days