ANSWER
Paul and Matt will take

to install the floor working together.
EXPLANATION
First, calculate Paul's rate, which is

Next, calculate Matt's rate, which is,

Let us assume that, Paul and Matt took

to do the work together.
Then, the rate of working together is,

Now, add the individual rates and equate to the rate of working together to form an equation that will help us solve for x.

Simplify the left hand side


We reciprocate both sides to get (You could have also done cross multiplication).

800(1+7)∧4
it will be $1048.63
Yes with what ? are u single ?
Answer:O_O
Step-by-step explanation:
If these four line segments are connected (kind of like a square) then only 4 endpoints are needed, but if they are all separate line segments, then you would need a maximum of 8 endpoints because any line segment has 2 endpoints and 4 line segments with 2 endpoints a piece equals 8 endpoints in total.
I hope this helped! :)