1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
fgiga [73]
3 years ago
11

Each day a small business owner sells 200 pizza slices at $3.00 per slice and 85 sandwiches at $3.00 each. Business expenses com

e to $80 per day. What is the owner's profit for a ten-day period?
Mathematics
2 answers:
oee [108]3 years ago
4 0
200x3=600
85x3=255
600+255=855
855-80=775
775x10=7,750
kirill [66]3 years ago
4 0
200*3=600
85*3=255
600+255=855
855*10=8550
80*10=800

8550-800= $7750
You might be interested in
The interest on $2,000 for 2 years is $320. What is the simple interest rate?
umka2103 [35]
R = 8%/year

Equation:
r = (1/t)(A/P - 1)
Calculation:
Solving our equation:
r = (1/2)((2320/2000) - 1) = 0.08
r = 0.08

Converting r decimal to R a percentage
R = 0.08 * 100 = 8%/year

The interest rate required to get a total amount, principal plus interest, of $2,320.00 from simple interest on a principal of $2,000.00 over 2 years is 8% per year.
7 0
3 years ago
A bucket that has a mass of 30 kg when filled with sand needs to be lifted to the top of a 30 meter tall building. You have a ro
Rom4ik [11]

Answer:

765 J

Step-by-step explanation:

We are given;

Mass of bucket = 30 kg

Mass of rope = 0.3 kg/m

height of building= 30 meter

Now,

work done lifting the bucket (sand and rope) to the building = work done in lifting the rope + work done in lifting the sand

Or W = W1 + W2

Work done in lifting the rope is given as,

W1 = Force x displacement

W1 = (30,0)∫(0.2x .dx)

Integrating, we have;

W1 = [0.2x²/2] at boundary of 30 and 0

W1 = 0.1(30²)

W1 = 90 J

work done in lifting the sand is given as;

W2 = (30,0)∫(F .dx)

F = mx + c

Where, c = 30 - 15 = 15

m = (30 - 15)/(30 - 0)

m = 15/30 = 0.5

So,

F = 0.5x + 15

Thus,

W2 = (30,0)∫(0.5x + 15 .dx)

Integrating, we have;

W2 = (0.5x²/2) + 15x at boundary of 30 and 0

So,

W2 = (0.5 × 30²)/2) + 15(30)

W2 = 225 + 450

W2 = 675 J

Therefore,

work done lifting the bucket (sand and rope) to the top of the building,

W = 90 + 675

W = 765 J

5 0
3 years ago
Can someone plzzzz help meee with the last 3 problems!!! I really need help
almond37 [142]
50% of 150=75+10=85
4 0
3 years ago
What is 5000000000000000times 409458374.9394ir
WINSTONCH [101]

Answer:

2,047,291,874,697,000,000,000,000

Step-by-step explanation:

that is the answer to the multiplication statement xD

7 0
3 years ago
What is the value of n? <br> N-36=135-30
Lunna [17]

Answer:

141

Step-by-step explanation:

N - 36 = 135 - 30

N - 36 = 105

N = 105 + 36

N = 141

6 0
4 years ago
Other questions:
  • Can a triangle have two right angles? Explan?
    7·2 answers
  • D
    12·1 answer
  • A timber fence is to be built on sloping land, with the shortest piece of timber 1.2 m and the longest 1.8 m. There are 61 piece
    5·1 answer
  • What is the slope of the line that passes through the given points? (6, 2) and (7, 4)
    8·1 answer
  • Find the value of x and y
    6·1 answer
  • Is 0.09 more or less than 0.9? same with 0.06 and 0.6.
    12·2 answers
  • I'll give brainly pls help​
    8·2 answers
  • What is it??,,,,,,,,,,,,
    15·2 answers
  • What is 1/2 in degrees
    10·1 answer
  • Can someone help me with this?
    11·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!