Answer:
The right answer is option (D).
Explanation:
According to the scenario, the most appropriate answer is option (D) because systematic study can be defined as the study of social relationships and behavior and making a decision on the basis of data collected.
While the other options are not that appropriate because of the following reasons:
- The organizational study can be defined as the study when a person organizes a process which results in boosting the social relation.
- Intuitive study shows the concept of making decision immediately without going deep on data collected.
- Theoretical study shows the concept of study anything very theoretic and than makes the decision.
- Case-based study shows the concept of study which checks though the results of similar cases to make any decision.
Answer:
C) variable costs of $72,000 and $25,000 of fixed costs
Explanation:
To determine the flexible budget we must first calculate the variable costs of producing 8,000 units:
direct labor per unit = $40,000 / 5,000 units = $8 per unit
electric power per unit = $5,000 / 5,000 units = $1 per unit
total variable cost per unit = $8 + $1 = $9
Total variable costs for 8,000 units = 8,000 units x $9 per unit = $72,000
Total fixed costs = $25,000
The question is: Which scale rating describes the greatest number of student and how many student responded with this rating.
From the frequency distribution table attach to the question, the scale rating with the highest number of student is 7 out of 10 and the number of students that responded with this rating is 27 students.
This question provides the defition for a producer cooperative
Answer:
standard price= $5
Explanation:
Giving the following information:
Quantity of direct materials used 3,000 lbs. Actual unit price of direct materials $5.50 per lb. Units of finished product manufactured 1,400 units Standard direct materials per unit of finished product 2 lbs.Direct materials quantity variance-unfavorable $1,000Direct materials price variance-unfavorable $1,500.
Direct material price variance= (standard price - actual price)*actual quantity
-1,500= (SP - 5.5)*3,000
15,000=3,000SP
5= standard price
Direct material quantity variance= (standard quantity - actual quantity)*standard price
Direct material quantity variance= (1400*2 - 3,000)*5
Direct material quantity variance= 1,000 unfavorable