To work out the percent increase, we can use the following equation:
24 / 10 = 2.4
2.4 x 100 = 240%
Hope I helped!
Using the z-distribution, the p-value would be given as follows:
b) 0.0086.
<h3>What are the hypothesis tested?</h3>
At the null hypothesis we test if the means are equal, hence:

At the alternative hypothesis, it is tested if they are different, hence:

<h3>What are the mean and the standard error for the distribution of differences?</h3>
For each sample, they are given as follows:
Hence, for the distribution of differences, they are given by:
.
<h3>What is the test statistic?</h3>
The test statistic is given by:

In which
is the value tested at the null hypothesis.
Hence:


z = -2.63.
Using a z-distribution calculator, for a two-tailed test, with z = -2.63, the p-value is of 0.0086.
Hence option B is correct.
More can be learned about the z-distribution at brainly.com/question/13873630
#SPJ1
Sorry, but there is no table to the right. Please put the table.
Mmm... I think it is 5/8... I think.
X=2 so 2+4=6 so y=6. I just gone ovee this unit aswell.