Josh has hiked 17 km, which is 2 km away from being 1/2 done.
<span>In a equation, this might look like: 17 + 2 = (1/2)h </span>
<span>where h is the length of the hike. </span>
<span>and solve for h, h = 38 km
Thank you for posting your question here at brainly. I hope the answer will help you. Feel free to ask more questions.
</span>
Step-by-step explanation:
The Answer Is
-4d + 7 = 3d
So, 7 = 3d + 4d
Then, 7 = 7d
•d = 7/7
= 1
So D = 1.
The equation of the line passing through
and
is
. Here
is the slope of the line.
Substituting numerical values, the equation of the line is

The equation of the line is 
the answer is 114 because first u have to × and then +