1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
inessss [21]
3 years ago
5

Select the TRUE statement below.

Social Studies
1 answer:
slega [8]3 years ago
7 0

Answer:-

d.Placing white space around graphics and headings helps them to stand out.

Explanation:-

Placing white spaces around the graphics and the heading makes them more beautiful and attractive than before.

Children do not like sites with dark colors they like sites with light and joyful colors.

Navigation is important for a website though the user can use the back button.

To increase the appeal of the website the text should be not very large and not very small it should be in an easily readable size.

You might be interested in
Which division of power include the ability to make laws that apply retroactively
kolbaska11 [484]

Answer:

the legislative branch

According to Article I of the Constitution, the legislative branch (the U.S. Congress) has the primary power to make the country's laws. This legislative power is divided further into the two chambers, or houses, of Congress: the House of Representatives and the Senate.

Explanation:

8 0
2 years ago
Why is the Upper Tamakoshi Hydro Project called as a project of National Pride? in which sectors of national development are dir
sergejj [24]

Explanation:

The Upper Tamakoshi hydroelectric power station is a 456MW run-of-the-river project under construction on the Tamakoshi River in the Dolakha District, approximately 200km away from Kathmandu, Nepal.

Construction on the Upper Tamakoshi hydropower project was started in 2011 and was expected to be completed within six years. The project’s progress was, however, hampered due to an earthquake in April 2015. The facility is currently scheduled for commissioning by the end of 2019.

The developer and operator of the project is Upper Tamakoshi Hydropower Limited, an autonomous company established by Nepal Electricity Authority (NEA) in March 2007.

The Upper Tamakoshi hydropower station is expected to produce 2,281GWh of electricity a year.

Upper Tamakoshi hydropower plant make-up

Upper Tamakoshi comprises a 22m-high and 60m-long concrete dam, two 225m-long de-sanding basins, an 8.4km-long headrace tunnel with 32.14m² of cross-sectional area, and an underground powerhouse (142m-long, 13m-wide, and 25m-high) equipped with six Pelton turbine units.

“The Upper Tamakoshi hydropower station is expected to produce 2,281GWh of electricity a year.”

The gross head height of the dam is 822m. Design flood and discharge capacities for the facility will be 885m³/s and 66m³/s, respectively.

Live storage capacity of the dam will be 1.2 million cubic metres. The 2.9km-long tailrace tunnel of the project will have a cross-sectional area of 35m².

Transmission and power purchase agreement

The power generated by the Upper Tamakoshi hydropower plant will be fed into the national grid through a 49km-long double circuit 220kV transmission line between Gongar and the Khimti power station.

The Nepal Electricity Authority (NEA) and Upper Tamakoshi Hydropower Limited signed a draft power purchase agreement (PPA) for the project in 2011. The NEA agreed to purchase the power output of the plant at a yearly average rate of NPR3.50 a unit.

Contractors involved

Norconsult and Lahmeyer provided detailed project design, construction management and monitoring services for the project.

The civil works contract for the project was awarded to Sinohydro Corporation. Andritz Hydro was awarded the contract for the design, manufacturing, and supply of electromechanical equipment, including turbines and generators for the project.

KEC International was contracted for the supply and erection of transmission lines as well as the substation.

Texmaco, an engineering and infrastructure company based in India, was engaged for the hydro-mechanical works for the project.

Financing

The total construction cost of the project was estimated to be NPR35.29bn ($441m) in 2011. Loans were extended by Nepal’s Employees’ Provident Fund ($131.6m), Nepal Telecom ($78.97m), Citizen Investment Trust ($26.32m), and Rastriya Beema Sansthan (RBS, $26.32m) to finance the project.

The Government of Nepal committed to providing a loan of up to NPR11.08bn ($145.8m) for the project.

The project cost has been reportedly escalated by $41.8m due to the delay and disruption caused by the 2015 earthquake.

Related Projects



Balaoi & Caunayan Wind Farm, Ilocos Norte, Phillippines

The Balaoi & Caunayan Wind Farm is an onshore wind farm project under construction by AC Energy in partnership with…

10 Jun 2021



Mutriku Wave Energy Plant

The Mutriku wave energy plant was officially commissioned by Spanish utility Ente Vasco de la Energía (EVE) in the Basque…

07 Jun 2021



Mutkalampi Wind Farm, Central and Northern Ostrobothnia, Finland

Mutkalampi is a proposed 404MW wind farm to be built in Finland by French renewable energy developer Neoen and Prokon…

04 Jun 2021



Rabigh-2 Combined-Cycle Power Plant

The 2,060MW combined-cycle Rabigh-2 independent power project (IPP) is located next to the 1,024MW Rabigh-1 power plant, 130km north of…

04 Jun 2021

Join Our Newsletter

Energy news and in-depth feature articles on the latest energy provider deals, energy innovations and trends in renewables, solar power, offshore wind, hydropower, coal and nuclear power

Receive our newsletter

Sign up to our e-Newsletter here

About us

Editorial Approach

Contact Us

Privacy Policy

Terms and Conditions

© Copyright Verdict Media Limited 2021

Powered by 

We use cookies to ensure that we give you the 

6 0
3 years ago
This territory was annexed by the United States in 1898, five years after planters there overthrew the leader and requested the
Brums [2.3K]
The answer is Hawai'i 
6 0
3 years ago
Read 2 more answers
Explain the difference between government subsidies and transfer payments. Give an example of a transfer payment.
Sedaia [141]

Answer:

hope it helps u

Explanation:

Subsidies are government financial aid given to businesses meant to help lower their costs or stimulate the economy. Transfer payments are government payments in which the government takes money from one group and gives it to another

8 0
2 years ago
In the late 19th century, which of the following reasons suggested that the United States needed to expand?
Llana [10]

Answer:

i believe the answer Is manifest destiny

5 0
2 years ago
Other questions:
  • Describe the factors that cause us to be attracted to another person. how do these factors differ for women and men
    14·1 answer
  • Ancient carpentry techniques in kyoto have houses built around what feature
    12·1 answer
  • Smoking remains more common in much of europe than in the united states. in the united states, there is a strong relationship be
    14·1 answer
  • Although the withdrawal symptoms are extremely challenging, millions of Americans have kicked the habit and live happy, smoke-fr
    5·1 answer
  • Learning effects tend to be Multiple Choice more significant when a technologically complex task is repeated. more significant w
    8·1 answer
  • Prior to 1800, the French were a scattered collection of groups that spoke different languages, celebrated different holidays an
    5·1 answer
  • Which of the following countries was most successful in creating long-lasting, permanent settlements along the Atlantic coast of
    11·2 answers
  • Some states authorize a to make healthcare decisions ------- for patients who can't make them because they're incapacitated. O a
    9·1 answer
  • At trial, in an effort to prove that the defendant suffers from a mental defect, a criminal defense attorney seeks to introduce
    5·1 answer
  • It is a good idea to use through streets rather than side streets to avoid ________________.
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!