Time taken by Michelle to complete the work alone = 6 hours
Time taken by Nancy to complete the work alone = 3 hours
Now, when they both are working on the same job for 1 hour,
Amount of job completed = (1/6) + (1/3)
= (1 + 2)/6
= 3/6
= 1/2
So in 1 hours time they both will complete half of the job. Then in 2 hours Michelle and Nancy will complete the total job. I hope the answer has come to your help.
Answer:
{HH, HT, TH, TT}
Step-by-step explanation:
The set of all possible outcomes in tossing a coin twice is;
{HH, HT, TH, TT}
In the first toss the coin may land Heads. In the second toss the coin may land Heads or Tails. This can be represented as;
HH, HT
Heads in the first and second tosses. Heads in the first toss followed by a Tail in the second toss.
In the first toss the coin is also likely to land Tails. In the second toss the coin may land Heads or Tails. This can be represented as;
TH, TT
Tails in the first toss followed by a Head in the second toss. Tails in the first and second tosses.
Combining these two possibilities will give us the set of all possible outcomes in tossing a coin twice is;
{HH, HT, TH, TT}
For a regular polygon with n sides, interior angle
= [(n-2) × 180°]/n
So, interior angle of this regular heptagon shape
= [(7 - 2) × 180°]/7
= (5 × 180°)/7
= 900°/7
= (900/7)°
= 128.571° [approximately]
To produce at a point lying inside the production possibilities curve would require economic growth.
<h3>What is
production possibilities curve ?</h3>
The production possibilities curve can be described as a graph that help to display the different combinations of output which can be gotten from given current resources and technology.
In this case, To produce at a point lying inside the production possibilities curve would require economic growth.
Learn more about production possibilities curve on:
brainly.com/question/26460726
#SPJ4
85 is the correct answer.