Answer:
the first one goes through (0,0) ||||||| the second is an exponential function so it goes through (0,1) and in a u shape going up ||||||| The third goes through (0,-1) ||||||||| The fourth goes through (0,1)
Step-by-step explanation:
these are identifiein traits so you can find wich one the graph corresponds to since u never gave us a graph.
Answer:
9/20 > 11/25
Step-by-step explanation:
11/25
= 44/100
9/20
= 45/100
45/100 > 44/100
Therefore,
9/20 is greater than 11/25
Answer:
(1,-25)
Step-by-step explanation:
I believe the answer is (1,-25) because when the function is graphed the vertex is at the point x=1 y=-25
Answer:
3 and 4
Step-by-step explanation:
Well to start we have to know that they are asking us, a factorized form of a quadratic expression
a quadratic expression is of the form
ax ^ 2 + bx + c
Now the factored form is as follows
a ( x - x1 ) ( x - x2 )
Next, let's look at each of the options
In this case we lack a term with x since if we solve we have a linear equation
1. 5(x+9)
5x + 45
In this case if we pay attention they are being subtracted instead of multiplying, so we will not get a quadratic function
2. (x+4) - (x+6)
-2
In this case we have everything we need, now let's try to solve
3. (x-1) (x-1)
x^2 - x - x + 1
x^2 - 2x + 1 quadratic function
In this case we have everything we need, now let's try to solve
4. (x-3) (x+2)
x^2 -3x +2x -6
x^2 -x - 6 quadratic function
In this case we have a quadratic function but we do not have it in its factored form since we can observe the x ^ 2
5. x^2 + 8x
Answer:
21 weeks
Step-by-step explanation:
In this question, we are to use proportionality to find the solution to the question.
We were made to know that the time taken to build the highway is varied directly with the length and inversely with the number of workers.
Let us make a mathematical representation for this.
Let the time be t, number of workers be w and length be l
t is directly proportional to l and inversely proportional to w
Mathematically;
t = kl/w
Where k is the constant of proportionality.
Let’s find the value of k
150 workers built 12 miles of highway in 14 weeks ; plug these in the equation to get k
14 = k * 12/150
k = 150 * 14/12 = 175
Now we want to get t given w and l
from ;
t = kl/w
We can get t; where l = 15 and w = 125
t = 175 * 15/125
t = 21 weeks