Answer:
40 hours will it take for the pool to fill.
Step-by-step explanation:
A pump can fill a swimming pool in 8 hours.
Work done by pump to fill in 1 hour is 
The pool also has a drain that can empty the pool in 10 hours.
Work done by pump to drain in 1 hour is 
If someone turns on the pump to fill the pool, but forgets to shut the drain.
Work done by both pipe in 1 hour is




Both pipe filled
part of pool in hours = 1
Both pipe filled complete pool in hours = 
Therefore, 40 hours will it take for the pool to fill.
Answer:2:5
Step-by-step explanation: you have 2 red marbles which is the numerator and 5 as the denominator because it is the bigger number .
Answer:
f(x) = -2/3(x +11) +5
Step-by-step explanation:
The point-slope form of the equation of a line will give you the desired linear function:
y = m(x -h) +k . . . . . for slope m through point (h, k)
You are give point (x, f(x)) = (-11, 5) = (h, k), and you are given slope m = -2/3. Putting these values into the function form gives ...
f(x) = -2/3(x +11) +5
Answer:
134/300 or 67/150
Step-by-step explanation:
the LCM of 15 and 100 is 300. 15 *20 is 300 so we multiply both the numerator and denominator of 1/15 by 20 to get 20/300, with 38/100 we multiply by 3 to get 114/300. Now we add 20/300 and 114/300 to get 134/300 which has a common factor of 2 so we can simply it to 67/150