Answer:
36
Step-by-step explanation:
if you start with 864 and she made 24 necklaces, your math equation would be 864 divided by 24 = 36
Answer:
There can be at most
attendees in a corporate team-building event.
Step-by-step explanation:
Let
denotes number of attendees in a corporate team-building event.
Fixed cost = $19
Cost charged per attendee = $1
Budget for the corporate team-building event = $31
Therefore,

So, there can be at most
attendees in a corporate team-building event.
Answer:
Step-by-step explanation:
The position function is
and if we are looking for the time t it takes for the ball to hit the ground, we are looking for the height of the ball when it is on the ground. Of course the height of anything on the ground is 0, so if we set s(t) = 0 and solve for t, we will find our answer.
and factor that however you are currently factoring in class to get that
t = -.71428 seconds or
t = 1.42857 seconds (neither one of those is rational so they can't be expressed as fractions).
We all know that time will never be a negative value, so the time it takes this ball to hit the ground is
1.42857 seconds (round how you need to).
Answer:
16 cm^2
Step-by-step explanation:
Given
-- Bigger Triangle
-- Smaller Triangle
--- Scale factor
Area of CBD = 9
Required
Determine the area of CAE
The area of triangle CBD is:


The area of CAE is:

Where:
and

The above values is the dimension of the larger triangle (after dilation).
So, we have:



Re-order


Recall that:



Hence, the area is 16 cm^2