Answer:
The cable run connecting the new keystone jack to the patch panel is bad.
The patch panel connector for the new location's cable run is not connected to a switch.
Explanation:
The cable run connecting the new keystone jack to the patch panel is bad.
The patch panel connector for the new location's cable run is not connected to a switch.
If you want them only to read it and not change it send as a .pdf else I would send as a .txt file. Hope that helps
D) Alt Tags thats the answer i think