Answer:
a) 3 people will need 35 days to paint the bridge
b) p=105/t
Step-by-step explanation:
a)
We have 7 people each one is to work 15 days, so the bridge needs a total of 7(15) days of work
7(15)=105
Then we have 3 people each one is to work t days, altogether should do a total of 105 days of work
3(t)=105
Solve for t
t=35
b)
Substitute p for 3 in the second equation
p(t)=105
Solve for p
p=105/t
Answer:
y = 0.524m + b is the answerrrr
3.14 can be expressed as 3.141592653589793238462643383279 with 30 decimal places.
Answer:
1 = t/45 + t/105
Step-by-step explanation:
Greg's father mow a lawn in 45 minutes that means that he mow in a rate of 1/45
Greg mow a lawn in 1 hour 45 minutes (105 minutes) that means that he mow in a rate of 1/105
If they mow a lawn in t minutes that means the rate is 1/t
Then, the rate in which they mow a lawn has to be equal to the sum of the rate individually as follows
1/t = 1/45 + 1/105
1 = t/45 + t/105