<span>An attribute in a relation of a database that serves as the primary key of another relation in the same database is called a</span>
Do details provide support for the claim
Answer:
There are multiple critical paths
Explanation:
The critical path method (CPM), or critical path analysis (CPA), is an algorithm for scheduling a set of project activities. It is commonly used in conjunction with the program evaluation and review technique (PERT). A critical path is determined by identifying the longest stretch of dependent activities and measuring the time required to complete them from start to finish.
The essential technique for using CPM is to construct a model of the project that includes the following:
- A list of all activities required to complete the project (typically categorized within a work breakdown structure),
- The time (duration) that each activity will take to complete,
- The dependencies between the activities and,
- Logical end points such as milestones or deliverable items.
Using these values, CPM calculates the longest path of planned activities to logical end points or to the end of the project, and the earliest and latest that each activity can start and finish without making the project longer. This process determines which activities are "critical" (i.e., on the longest path) and which have "total float" (i.e., can be delayed without making the project longer).
considering the above function of the cpm analysis because you have multiple path, there is tendency that more than path through the project network will have zero slack values.
Answer:
0.8488
Explanation:
Let E =error found by test 1
Let F=error found by test 2
Let G=error found by test 3
Let H=error found by test 4
Let I= error found by test 5
Given P(E)=0.1, P(F)=0.2, P(G)=0.3, P (H)= 0.4, P (I)=0.5
therefore P(notE)=0.9, P(notF)=0.8, P(notG)=0.7, P(not H)=0.6, P (notI)=0.5
Tests are independent P(not E & not F ¬ G & not H & not I=P(notE)*P(notF)*P(notG)*P (notH)*P (not I) =0.9*0.8*0.7*0.6*0.5 =0.1512
P(found by at least one test)= 1- P(not found by any test)=1-P(not E& not F & not G & not H & not I ) = 1-0.1512 = 0.8488