Answer: Probability/impact risk matrix
Explanation: Probability/impact risk matrix is type of matrix that defines the probability as well as impact that depicts whether the risk is low ,high or moderate.
Impact matrix is sort of tool which helps in conversion of any plan into a action. Probability matrix help in defining the chances in defining the risk.The positioning of the impact value of risk is plotted on the vertical axis and performance value on the horizontal axis.
Thus probability/impact matrix is the correct tool for the problem mentioned in the question.
A process or set of rules to be followed in calculations or other problem-solving operations, especially by a computer.
Answer: or element_id Specifies the relationship between the result of the calculation, and the elements used in the calculation
form form_id Specifies which form the output element belongs to
name name Specifies a name for the output element
Explanation:
PWC stands fro personal water craft (aquascooter, jet bike,
jet ski, wave runner, ski free, motorised
surfboard etc.). The operator of PWC must be at least 16 years old.
In order to minimize the risk of accident or injury the PWC operator must follow several rules:
- the pwc operator should know the boating rules
- to monitor the speed of the vessel to ensure that a safe speed is being maintained.
- to adhere to the 5 knot rule (approximately 10kph) when close to shore,
other boats (including boats at anchor) around dive flags and swimmers,
fixed structures (ramps and jetties)