Answer: Number of months = 66.87 months
Explanation:
Given that,
Monthly Payment = $500
Interest rate(r) = 1.95% per month
Current Balance = $18,500
Number of months(t) = ?







Taking log on both side
t log(1.0195) = log(3.5906)

t = 66.87 months
Answer:
"Fell" "Harder"
Explanation:
When housing prices fell as they did beginning in 2006 following the housing market bubble, most banks and other lenders tightened the requirement for borrowers, making it harder for potential home buyers to obtain mortgages.
Answer:
The male frog would join the female frog in the water poodle
Explanation:
Mathematically,
Let x = temperature the 10000 joules from sun Ray would raise the temperature of the copper
So therefore:
10000 = m * (x - 33°) * Spc
Where m = mass of copper = 400g
Spc = specific heat capacity of copper = 0.387j/g/°c
So
400 * ( x - 33) * 0.387 = 10000
( x - 33 ) = 10000/ (400 * 0 387)
x = 97.6 °c
Temp for water where m = mass of water = 100g
x¹ = temperature the sun Ray of 10000 joules would raise the temp of water too.
Spw = specific heat capacity of water = 4.184j/g/°c
So therefore;
100 * ( x¹ - 33 ) * 4.184 = 10000joules
x¹ - 33 = 10000/ (100 * 4.184)
x¹ = 56.9°c
Since x for the male frog is greater than x¹ for the female frog, the male frog would be more uncomfortable because it's environmental temp is far higher than the comfort zone tem which is 20° to 40°c so it would move to join the female frog.
Answer:
B. The lessor does not have the right to stop delivery in transit due to the lessee's breach of the lease agreement; instead, the lessor must deliver the goods to the lessee in spite of the breach, and then sue the lessee for damages.
Explanation:
During the transit of goods, if the lessor learns of a breach of the lease agreement, he has every right to stop the delivery of the goods in transit by notifying the goods carrier or bailee. Since the carrier of the goods reports directly to the lessor, once he receives instructions from the lessor to stop delivery of goods, and he still has sufficient time, the delivery should be stopped.
Once the goods are reclaimed, the lessor can then decide to sue to recover damages. He can also, decide to cancel the contract at that point
Answer:
9 kanban
Explanation:
The calculation of the number of kanban containers needed is given below:
= (Lead time demand + Safety stock) ÷ kanban size
where,
Lead time demand is
= 1,500 radios × 1 days
= 1,500 radios
Container size = 250 radios
Safety Stock is
= 1 ÷ 2 day × 1,500 radios
= 750 radios
So, the number of kanban containers needed is
= (1,500 radios + 750 radios) ÷ (250 radios)
= 9 kanban
We simply used the above formula to find out the required kanbans