1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Nataliya [291]
3 years ago
10

If the 2412 leaves are not a random sample, but the researchers treated the 2412 leaves as a random sample, this most likely mad

e the data more:_____________.1. accurate, but not precise2. precise, but not accurate3. neither4. both accurate and precise
Mathematics
1 answer:
Gelneren [198K]3 years ago
6 0

Answer:

2. Precise but not accurate

Step-by-step explanation:

In a high precision, low accuracy case study, the measurements are all close to each other (high agreement between the measurements) but not near/or close to the center of the distribution (how close a measurement is to the correct value for that measurement)

You might be interested in
Answer this Venn diagram Question. I will make you brainliest +50 points.​
Shtirlitz [24]

Here is the answer!

7 0
2 years ago
Read 2 more answers
4. Find MN help plzzzzz​
sergij07 [2.7K]

Answer:

71

Step-by-step explanation:

6 0
3 years ago
A contestant on a game show has 30 points. She answers a quest on correctly to win 15 points. Then she answers a question incorr
Morgarella [4.7K]
The contestants total number of points is 20.

30 + 15 = 45
45 - 25 = 20 total points
7 0
3 years ago
Read 2 more answers
Brad says that if a second number is 125% of the first number, then the first number must be 75% of the second number. Is he cor
olga55 [171]

Answer: He is not correct.

Steps:

Let x1 and x2 be the first and second number, respectively.

x_2 = \frac{5}{4}x_1\\\frac{4}{5}x_2 =x_1

In words, if the second is 125%, or 5/4 of the first number (first equation),

then the first is 4/5 of the second, which is 0.8 or 80%.

8 0
3 years ago
Phoebe usually drives to work each day on a 12-mile road that is currently closed for construction. While the road is closed she
Mumz [18]

The total distance phoebe has to drive each day (round trip) while her usual route is closed is 42 miles

<h3>What is a Pythagoras theorem?</h3>

The square of the longest side is equal to the square of the sum of the othersides.

Before we can calculate the total distance, we will need to get the hypotenuse on  both sides using the Pythagoras theorem as shown:

H^2= 12^2 + 9^2

H² = 144 + 81

H² = 225

H = 15

For the other hypotenuse

h² = 12² + 5²

h² = 144 + 25

h²  = 169

h = 13 mils

The total distance = 5 + 15 + 9 + 13

The total distance = 42 miles

The total distance phoebe has to drive each day (round trip) while her usual route is closed is 42 miles

Learn more on Pythagoras theorem here: brainly.com/question/12306722

3 0
2 years ago
Other questions:
  • 5 pounds for $19.00 Cost per pound how much is it for one pound<br>​
    5·2 answers
  • A man is walking across a 300 foot long field at the same time his daughter is walking towards him from the opposite end. The ma
    15·1 answer
  • Which is the slope of a line with the coordinates (1,4) and (3,1)
    11·2 answers
  • 10x10x10 as an exponent
    15·2 answers
  • 360 miles in 6 hours
    11·1 answer
  • 1 1/2 years is how many months
    10·2 answers
  • Help on this due soon, will give brainliest
    5·1 answer
  • The kids are racing around a circle on the playground with a radius of 12 feet. If they ran around it 5 times, how far did they
    5·1 answer
  • PLEASE HELP .!!! ILL GIVE BRAINLIEST.. *EXRTA POINTS* .. DONT SKIP :(( ! <br> ILL GIVE 40 POINTS .
    6·2 answers
  • Copy the proof on paper, mark the givens in the diagram, and fill in the blanks to complete the proof.
    11·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!