Answer:
$46,800
Explanation:
Total overhead costs based on traditional systems of both products are: $52,000 +$78,000 = $130,000
Assuming that Perry Corporation applies the activity-based (setups and components) costing system instead of the traditional one, the overhead cost for the standard model can be calculated as following:
+) Overhead cost of each setup (for both products) = $52,000/(12 + 28) = $1,300
+) Overhead cost of each components (for both products)
= 78,000 / (8+12) = $3,900
=> Total overhead costs using activity - based costing system is:
<em>Total overhead costs = 1,300 x Number setups needed for standard model + 3,900 x Number of components needed for standard model</em>
<em>= 1,300 x 12 + 3,900 x 8 </em>
= $46,800
The doctor is responsible for supplying the required instruments for the surgery procedure.
<h3 /><h3>What is the real meaning of a doctor?</h3>
A person certified to exercise medicine, as a physician, surgeon, dentist, or veterinarian. someone who has been presented with a doctor's degree can be called as Doctor. He is a Doctor of Philosophy.
The buying process of surgical equipment for the successful operation of a patient is initiated by the doctor and the hospital authorities.
Therefore, The doctor is responsible for supplying the required instruments for the surgery procedure.
learn more about doctors here:
brainly.com/question/9663298
#SPJ1
The return of equity will increase. Businesses can finance
themselves with debt and equity capital. By aggregating the quantity of debt
capital kin to its equity capital, a company can increase its return on equity.
The way in which rising financial leverage increases ROE is a
little less instinctive. One way to think about it is that if a business
adds debt, its assets increase for the reason that its
cash inflows from the debt issuance and so does its
entire debt.
Answer:
Rent of the building will remain the same
Explanation:
The fixed costs will not change because fixed cost remains fixed for any level of activity whereas the variable cost changes with the increase in level of activity. As the activity level will change with additional hours work which will increase the variable costs only. So all variable costs will increase whereas fixed will remain fixed. The all the other options were variable costs except rent which is fixed cost. So rent will no change because of additional hours worked.
A job analysis method is valid if it accurately assesses each job's duties.
A job analysis helps companies list appropriate taste and expectations for a job listing. It's important to make sure the people applying for the job and ultimately getting hired are well aware of their tasks and responsibilities in that position.