Answer: the awnser to this problem is 38.5 sq. units
Step-by-step explanation:
We know that
<span>Peter has already delivered </span><span> 2 pizzas in 5 minutes
so
1 hour-------> 60 minutes
</span><span>time left------> 60 minutes - 5 minutes--------> 55 minutes
</span>pizzas to deliver to beat his previous record----------> 20-2------> 18 pizzas
therefore
in the next 55 minutes
if the
<span>average per minute = (18/55) pizzas /minute
</span>Pete beat his previous record
<span>
</span>average per minute > (18/55) pizzas /minute
Pete overcome the previous record
average per minute < (18/55) pizzas /minute
Pete will not match the previous record
Answer:
y=mx+b
Step-by-step explanation:
that is the equation
11 ft/s
1800000 mL/h
89.6 oz/gal
equation of line passing through (1,-7)( -4,8)
First let's find slope (m)
m = (8+7)/(-4-1)
= 15/-5 = -3
(x1,y1) = (1,-7)
Plugging above value in
y - y1 = m( x-x1)
y+7 = -3( x-1)
y+7 = -3x +3
y+3x +4=0