Answer:
48
Step-by-step explanation:
Create an equation to represent this, where x is the unknown number.
+ 6 = 18
Solve for x, by first subtracting 6 from both sides:
= 12
Multiply each side by 4:
x = 48
So, the number is 48
Hello!
In order to create a complete triangle, the sum of the two smaller sides must be greater than the largest side. This can be expressed using the following formula:
(S1) + (S2) > (S3)
We'll begin by inserting the first set of values into the inequality above:
3 + 6 > 10
Simplify the left side:
9 > 10
The inequality (9 > 10) is false. Therefore, the first set of values can be eliminated. Now complete the same process for the next set of values:
3 + 6 > 9
9 > 9
The inequality (9 > 9) is false. Therefore, we can eliminate the second set of values as well. Now complete the same process for the third set of values:
4 + 6 > 9
10 > 9
The inequality (10 > 9) is true. Therefore, we can confirm the third set of values (4 ft - 9 ft - 6ft) as a valid answer.
I hope this helps!
Answer:
y = 10x - 2
Step-by-step explanation:
From the table attached,
Let the equation of a line passing through two points
and
is,
y = mx + b
Here, m = slope of the line
b = y-intercept
Since, m = 
Slope of the line passing through (0, -2) and (1, 8) will be,
m = 
m = 10
y-intercept 'b' = -2 [Output value at x = 0]
Therefore, equation of the line will be,
y = 10x - 2
9514 1404 393
Answer:
C) 8 miles per hour
Step-by-step explanation:
To find miles per hour, divide miles by hours.
(1/4) ÷ (1/32) = 1/4 × 32/1 = 32/4 = 8 . . . . miles per hour
Let the projected number of work hours be w.
Then the number of hours he actually worked was 1.25w. This represents the number of hours that Bob actually spent on the project.
Another way in which to answer this would be as follows:
Actual work hours = w + h (h hours beyond the projected w work hours).
This w + h is equivalent to 1.25w. This means that h = 0.25w.