Answer:
See picture and explanation below.
Step-by-step explanation:
With this information, the matrix A that you can find is the transformation matrix of T. The matrix A is useful because T(x)=Av for all v in the domain of T.
A is defined as
denotes the vector of coordinates of
respect to the basis
(we can apply this definition because
forms a basis for the domain of T).
The vector of coordinates can be computed in the following way: if
then
.
Note that we have all the required information:
then
hence
The matrix A is on the picture attached, with the multiplication A(1,1,1).
Finally, to obtain the output required at the end, use the properties of a linear transformation and the outputs given:
In this last case, we can either use the linearity of T or multiply by A.
You can also use desmos to find any graphing type of equations
It's 18/100. The reduced / simplest form is 9/50 because you divide it by 2 since it's the GCS.
Answer:
Step-by-step explanation:
Given that the demand for the 6 p.m. flight from Toledo Express Airport to Chicago's O'Hare Airport on Cheapfare Airlines is normally distributed with a mean of 132 passengers and a standard deviation of 42
Let X be the no of passengers who report
X is N(132, 42)
Or Z is 
a) Suppose a Boeing 757 with a capacity of 183 passengers is assigned to this flight.
the probability that the demand will exceed the capacity of this airplane
=

b) the probability that the demand for this flight will be at least 80 passengers but no more than 200 passengers
=
=0.4474+0.3907
=0.8381
c) the probability that the demand for this flight will be less than 100 passengers

d) If Cheapfare Airlines wants to limit the probability that this flight is overbooked to 3%, how much capacity should the airplane that is used for this flight have? passengers
=
e) 79th percentile of this distribution
=
0.47 is the answer. Because it's in the middle of 0.43 and 0.50. I answered this on your last question =p