The second answer is correct
Answer:
75.95cm
Step-by-step explanation:
<u>4.9 multiplied by 15 will represent the 15</u> <u>seconds</u>
4.9 • 15 = 73.5
<u>4.9 divided by 2 will equal the 1/2 seconds</u>
4.9 ÷ 2 = 2.45
<u>add them all together</u>
73.5 + 2.45 = 75.95 cm
Answer:
The steepness of the hill is a function of the speed of the sled.
<em>Hope this helps :)</em>
Answer: It's not a polynomial
It's not a polynomial because the exponent of -1 in the second term. The exponents for any polynomial must be nonnegative whole numbers {0,1,2,3,...}
112 is correct, 56 times 2.