1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
-Dominant- [34]
3 years ago
7

What is the value of x in the equation 4= xover3 -5

Mathematics
1 answer:
butalik [34]3 years ago
3 0
4=x/3-5
4=x/-2
x=-8
so -8 it is
You might be interested in
Rne subtracted 6x3 2x
artcher [175]
F(x) = 3-2x/x that is the answer
5 0
2 years ago
Kevin made 4 of his 6 shots on goal at soccer practice.
mafiozo [28]

Answer:

48

Step-by-step explanation:

4/6 = 2/3

2/3 times 72 = 48

8 0
2 years ago
What descibes the cross section of a cube that passes through a b c and d
Ulleksa [173]

Answer:A rectangle that is not a square

Step-by-step explanation:

8 0
3 years ago
GUYS QUICK! what is the surface area of a sphere that has a radius of 5 cm
alisha [4.7K]

Answer:

100 pi cm^2

or approximately 314 cm^2

Step-by-step explanation:

The surface area of a sphere is given by

SA = 4 pi r^2

The radius is 5

SA = 4 *pi * 5^2

SA = 4*pi(25

SA = 100 pi cm^2

If pi is 3.14

SA = 100 *3.14 = 314 cm^2

4 0
2 years ago
Read 2 more answers
An assembly line with 10 tasks needs be designed. The total time for all tasks is 16 minutes. If you need to produce 30 units/ho
Sindrei [870]

Answer: 8 minimum work stations is what would be needed.

Step-by-step explanation:

The cycle time is computed as the operating time daily divided by the scheduled output.

It is important to note that the daily capacity of the operation layout is the operating time divided by the cycle time.

Therefore,

If you need to produce 30units/hour.

The average cycle time is as follow:

The average cycle time is the average time between the completions of units.

60/30= 2 average cycle time

=16/2

=8

8 work stations is the minimum number that would be needed.

It is important to know that in an assembly line balancing, the minimum number of work station is the ratio of the sum of all tasks time to the cycle time.

5 0
3 years ago
Other questions:
  • If z = 3x2 + y2 and (x, y) changes from (1, 1) to (0.95, 0.9), compare the values of δz and dz. (round your answers to four deci
    9·1 answer
  • A surf instructor has an initial fee of $12 and charges $8
    5·1 answer
  • A tennis ball travels at 120 miles per hour. what is this rate in feet per second
    15·1 answer
  • Solve the equation.​<br>-3x + 1 + 10x= x + 4
    12·1 answer
  • What is 3 made into a fraction
    12·2 answers
  • HELP ASAP PLEASE!! GIVING BRAINLIEST
    13·1 answer
  • A company's 'dividend yield' is defined as the ratio between its share price and its dividend per share, i.E. Dividend Yield=Div
    12·1 answer
  • What is the length of the hypotenuse
    6·1 answer
  • Near a coral reef, a barracuda swam at a steady speed for 4.4seconds. It swam 33meters in that time. What was its speed?
    14·1 answer
  • Lynn says that the product of 4/5 and 5/2 is greater than 4/5 which statement is tre
    10·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!