Answer:
True
Step-by-step explanation:
The variable overhead rate variance refers to the difference in two variables.
The Variables are
1. The actual variable manufacturing overhead
2. The expected variable overhead given the number of hours worked
Labor rate variance is evaluated by
AH(AR - SR)
AH = actual hours
AR = actual rate
SR = standard rate.
The variable overhead rate variance is also calculated the same way except that it replaces the direct labor rates with variable overhead rates
Answer:
from my opinion second option is right
20 should be the answer because 205 divided by 10 =20
Answer:
x 0.27
Step-by-step explanation:
if they are both decreasing then just add the two percentages together then divide by 100 to give you your decimal answer
(3,59)(5,87)
slope = (87 - 59) / (5 - 3) = 28/2 = 14 <== ur slope
y = mx + b
slope(m) = 14
use either of ur points...(3,59)...x = 3 and y = 59
now we sub and find b, the y int
59 = 14(3) + b
59 = 42 + b
59 - 42 = b
17 = b <=== ur y int (0,17)