A. Union Street
Hope This Helps!
Answer: -2,000,000
Step-by-step explanation:
Think of it as -3,000,000 + 1,000,000
Answer:
$3.42
Step-by-step explanation:
Meters of material required = 1.2 meters
Cost per meter of material = $0.85
Direct labor hours = 0.1
Cost of direct labor per hour = $15
Overhead rate = $9 per direct labor hour
Standard cost per unit of product :
(Direct material cost per unit + direct labor cost per unit + overhead cost per unit)
Direct material cost per unit :
Material needed × cost per meter = (1.2 × $0.85) = $1.02
Direct labor cost per unit :
Direct labor hour × cost per hour = ( 0.1 × $15) = $1.5
Overhead cost:
0.1 * $9 = $0.9
Standard cost :
($1.02 + $1.5 + $0.9) = $3.42
Given that :-
→ N represent the number of bikes .
→ Weight of container including bikes is 250+23(n-1) pounds.
To Find :-
→ Weight of container when we have 20 bikes.
Solution :-
→ Weight = 250+23(n-1) pounds
Putting the value of n here .
→ Weight = 250+23(20-1)
→ Weight = 250 +23(19)
→ Weight = 250 + 437
- → Weight of container is 687 pounds.