1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
masya89 [10]
3 years ago
9

I need help on these what is 5=g-8

Mathematics
1 answer:
Levart [38]3 years ago
7 0
The answer is g=13 I hope this helped
You might be interested in
Packages of laundry soap are labeled 70 oz, but they are actually filled with mean contents of 70.2 oz and standard deviation 0.
kozerog [31]

Answer:

Step-by-step explanation:

3 0
2 years ago
Kevin is 3 times as old as Daniel. 4 years ago, Kevin was 5 times as old as Daniel. How old is Daniel now
matrenka [14]
<span>K = 3D. K - 4 = 5(D - 4). K - 4 = 5D - 20. K = 5D - 16. 3D = 5D - 16. 16 = 2D. D = 8. K = 3 x 8. K = 24.</span>
7 0
3 years ago
2<br> 1 point<br> Find UV.<br> U V<br> 56<br> 45<br> --D<br> W
Tomtit [17]

Answer:

11

Step-by-step explanation:

UV=UW-VW=56-45=11

5 0
1 year ago
Which of the following is the best description for this pair of angles?
hjlf

Answer:

Supplementary

Step-by-step explanation:

Supplementary angles add to 180 degrees.

6 0
3 years ago
Read 2 more answers
8 men will take 10 days to build a wall 150 metres long. After the men had started working for 6 days, they were told that the w
Mashutka [201]
First, find out how much each man works. If eight men take 10 days to build 150 m of wall, then that means that it takes 80 man days to build 150 m. One Man day is then 150÷80, in other words 1.875. If eight men have already been working for six days, then they have spent 8×6 man days, 48. 48 men days times 1.875 m of wall per man day equals 90 m of wall have been built. So, you have four days left to build the remaining 60 m of wall as well as 45 extra meters, in other words, 105 m total. 105 m divided by four days equals 26.25 m need to be built every day. Since one man builds 1.875 m of wall every day, to find the number of men total you need for the last four days, take 26.25÷1.875, Which equals 14 exactly. 14 is not the answer however, because it’s asking how many more men you need. Since you already have eight, you need six more to make 14

The answer is six more men
3 0
2 years ago
Other questions:
  • 32 is 40% of what number? please show working.
    9·1 answer
  • Who runs the fastest ? (ONLY ANSWER IF YOU KNOW IT BECAUSE CORRECT ONE GETS BRAINLIEST)
    14·1 answer
  • The sum of two numbers is 9 . one number is nine less than twice the other. find the two numbers.
    11·1 answer
  • Find the area please.
    7·2 answers
  • 1. If 31 – 7 = 51, then 61 =<br> A. 21<br> B. -7<br> C. -21<br> D. 42
    13·1 answer
  • ajoke needs 400000 for her tuition. if her bank gives a 9% 180 day loan notes, with interest compounded daily, what would she ow
    5·1 answer
  • Kenji is traveling in Europe and renting a car. He is used to thinking of gasoline amounts in gallons, but in Europe it is sold
    10·1 answer
  • Patrick has decided to open a simple
    9·1 answer
  • Which of the following can not be used to calculate 32% of 50
    15·1 answer
  • The object above is symmetrical through Y = 17 inches Z = 18 inches, and H = 11 inches, what is the area of the object ?
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!