Answer:
a: 28 < µ < 34
Step-by-step explanation:
We need the mean, var, and standard deviation for the data set. See first attached photo for calculations for these...
We get a mean of 222/7 = 31.7143
and a sample standard deviation of: 4.3079
We can now construct our confidence interval. See the second attached photo for the construction steps.
They want a 90% confidence interval. Our sample size is 7, so since n < 30, we will use a t-score. Look up the value under the 10% area in 2 tails column, and degree of freedom is 6 (degree of freedom is always 1 less than sample size for confidence intervals when n < 30)
The t-value is: 1.943
We rounded down to the nearest person in the interval because we don't want to over estimate. It said 28.55, so more than 28 but not quite 29, so if we use 29 as the lower limit, we could over estimate. It's better to use 28 and underestimate a little when considering customer flow.
Answer:
I pick a , and e
Step-by-step explanation:
a - Proportional relationship maybe because the line is slanted and the first dot is on 0 then it moves five up and if it keeps going on it would end up like a multiplication chart of the 5
hope this helped
e - x on the line is 2 , y is 5 because graph 2 then moves up five times which will result to (x 2,y 5)
hope this helped
Answer:
2/5cm or 0.4cm
Step-by-step explanation:
Area of square = 
Thus, Side = 
= 
= 2/5 cm = 0.4cm
Answer:
Kim
is correct
Step-by-step explanation:
Here, we want to know who is correct between Kim and Danielle
From the question, what is not completed is 15 out of 200
To find what is not completed, we divide 15 by 200
Thus, we have;
15/200 = 0.075
This mean Kim is correct