Lol why did the British call
Refining should a product backlog item be refined before its development begins.
Step 1: Analyze the Data.
Step 2: Integrate the Learning.
Step 3: Decide what to do Next.
Step 4: Refine the Backlog Items.
Step 5: Get the High-Priority Items Ready.
Requirements are only loosely defined in Scrum and should be reviewed and clearly defined before entering a sprint. This is done during the current sprint in a ceremony called Product Backlog Refinement.
In Scrum, the product backlog is an ongoing process in which the product owner and the development team work together to ensure that the product backlog items: their implementation efforts, and.
Learn more about product backlog at
brainly.com/question/8526059
#SPJ4
Answer:
Great Plains
Explanation:
The Great Plains are flat lands or plain land that has no building or farmland on it. They are often covered with grass and are located in the United States and Canada.
This great plain enables wind to blow uncontrollably without hindrances because the environment are free, no houses. This inturn can be of great benefit especially in term of wind energy because wind power holds great promise for the United States because of the GREAT PLAINS and experts believe wind energy could meet as much as 20 percent of the nation’s energy needs. Therefore GREAT PLAIN are often use to conserve energy in the United State due to the environment.
GREAT PLAINS lies in west of the Mississippi River tallgrass prairie in the United States and east of the Rocky Mountains in the U.S. and Canada
The answer of this is place