<span>The kill -9 2129, kill -s KILL 2129, or kill -KILL 2129 commands</span>
Answer:
CLS
INPUT"Enter any three numbers";a,b,c
IF a>b AND a>c THEN
PRINT a;"is the greatest"
ELSEIF b>a AND b>c THEN
PRINT b;"is the greatest"
ELSE
PRINT c;"is the greatest"
ENDIF
END
Answer:
List items are usually accessed using the indexing operator.
Explanation:
Depends on the language, and what you mean with extracting? Do you mean accessing or removing?
Answer:
A pre-programmed function is a section of code which is reusable to perform certain routine. One benefit of using a pre-programmed function to analyze data is the code redundancy can be reduced. The function is only written for once and it can be called to perform a specific data analysis whenever it is needed.
Besides, a pre-programmed function also offer consistent analytical output as all data are processed by a same analytical procedure in the function.
Answer:
There are multiple critical paths
Explanation:
The critical path method (CPM), or critical path analysis (CPA), is an algorithm for scheduling a set of project activities. It is commonly used in conjunction with the program evaluation and review technique (PERT). A critical path is determined by identifying the longest stretch of dependent activities and measuring the time required to complete them from start to finish.
The essential technique for using CPM is to construct a model of the project that includes the following:
- A list of all activities required to complete the project (typically categorized within a work breakdown structure),
- The time (duration) that each activity will take to complete,
- The dependencies between the activities and,
- Logical end points such as milestones or deliverable items.
Using these values, CPM calculates the longest path of planned activities to logical end points or to the end of the project, and the earliest and latest that each activity can start and finish without making the project longer. This process determines which activities are "critical" (i.e., on the longest path) and which have "total float" (i.e., can be delayed without making the project longer).
considering the above function of the cpm analysis because you have multiple path, there is tendency that more than path through the project network will have zero slack values.