The answer is 132. 132 is the original price. 80$ x 65% = 52. 80 + 52 = 132. So 132 is answer and original price.
If I am correct the answer is 369,600 feet per hour.
Well the answer is 43.86, but if it is asking for an estimate you’d prolly round to either 40 or 45. hope this helps
To find out if a set satisfies the inequality, you can either plug in the points into the equation, or you can plug in the points into the graph.
Any point in the shaded area and on the line satisfy the inequality. If the inequality had a sign of < or >, then the point can not be on the line, only in the shaded area.
A.) This is a solution because they are all in the shaded area
B.) This is not a solution because (7,-2) is outside the shaded area
C.) This is not a solution because (3,3) is outside the shaded area
D.) This is not a solution because (2,1) is outside the shaded area