1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
amm1812
3 years ago
15

Helpppp I’ll mark brainliest

Mathematics
1 answer:
Svetllana [295]3 years ago
3 0
X is 5
Y is 25 and then you just multiply by 3 each time
You might be interested in
Use the distributive property to fill in the blanks below.
elena-14-01-66 [18.8K]

Answer:

(5×7)-(5×6) = 5×(7-6)

5 0
3 years ago
What is the area, in square centimeters, of the trapezoid below? 18.2 cm 9.2 cm 8.3 cm​
zubka84 [21]
Answer:
113.71 cm^2
Explanation m:
Area= a+b/2 h
18.2 + 9.2/2 •8.3 = 113.71
5 0
3 years ago
Jose wants to build a rectangular kennel for his dog. His dad will let him useca spot in the corner of the yard that is 12 feet
Crazy boy [7]
The answer is probably about 21 feet






3 0
3 years ago
Read 2 more answers
mr.wilson saved 2,500 to buy airlines tickets he bought airline tickets for $372 each how much savings does mr.wilson after he b
ozzi
2,500 subtracted by 372 equals 2148. 2148 dollars is how much savings he has left.
7 0
3 years ago
Read 2 more answers
Calls to a customer service center last on average 2.8 minutes with a standard deviation of 1.4 minutes. An operator in the call
Natali5045456 [20]

Answer:

The expected total amount of time the operator will spend on the calls each day is of 210 minutes.

Step-by-step explanation:

Normal Probability Distribution:

Problems of normal distributions can be solved using the z-score formula.

In a set with mean \mu and standard deviation \sigma, the z-score of a measure X is given by:

Z = \frac{X - \mu}{\sigma}

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.

n-values of normal variable:

Suppose we have n values from a normally distributed variable. The mean of the sum of all the instances is M = n\mu and the standard deviation is s = \sigma\sqrt{n}

Calls to a customer service center last on average 2.8 minutes.

This means that \mu = 2.8

75 calls each day.

This means that n = 75

What is the expected total amount of time in minutes the operator will spend on the calls each day

This is M, so:

M = n\mu = 75*2.8 = 210

The expected total amount of time the operator will spend on the calls each day is of 210 minutes.

6 0
3 years ago
Other questions:
  • I need help on 9-10 , I will mark brainliest
    12·2 answers
  • Hi may someone help me out with this please
    15·1 answer
  • A right triangle's height is 3 times the length of its base. if the area of the triangle is 600, what is the height?
    12·1 answer
  • Please answer A B C or D:
    9·1 answer
  • Is a vertical line a function
    7·1 answer
  • Evaluate twenty-five minus three x for x equals zero, one, two, three, and four. Which of the following correctly describes the
    8·2 answers
  • I wanna finish this hw but I don't know how to do it pls teach me
    5·2 answers
  • Which expression is equivalent to &gt;<br> 7^8/7 <br><br> 7^9<br> 7^8<br> 7^7<br> 1/7^8
    13·1 answer
  • Find the midpoint of (-3,7) and (-9,1).​
    13·2 answers
  • Write the equation of a line that is perpendicular to y=5 and that passes through the point (−7,−5)
    13·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!