1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Rudik [331]
3 years ago
14

Someone plz help me 1-1\2c=6

Mathematics
1 answer:
GarryVolchara [31]3 years ago
6 0

1 - 1/2c = 6

1 -1 - 1/2c = 6 -1 (subtract 1 on both sides)

-1/2c = 5 (next do the inverse operation)

c = 5 ÷ 1/2

c = -10

to check your answer substitute the value of c in the equation;

1- 1/2c = 6

1- 1/2(-10) = 6

1 + 5 = 6

6 =6



You might be interested in
An older person is 4 years older than 7 times the age of a younger person. The sum of their ages is 44. Find their ages
Fynjy0 [20]

Answer:

5 yr and 39 yr

Step-by-step explanation:

Let x = the age of the younger

then 7x + 4 = the age of the older

Now x + 7x + 4 = 44

8x + 4 = 44

8x = 40

x = 5

7x + 4 = 7(5) + 4 =  35 + 4 = 39

Check:  5 + 39 = 44

8 0
3 years ago
Solve by factoring or finding square roots x^2-18x-40=0
irina1246 [14]

Answer:

Step-by-step explanation:

8 0
3 years ago
Read 2 more answers
Find the indicated area under the curve of the standard normal​ distribution; then convert it to a percentage and fill in the bl
galben [10]

Answer:

95%

Step-by-step explanation:

About 95% of the area is within two standard deviation in standard normal distribution. This can be explained by finding the probability within 2 standard deviation using standard normal distribution.

P(z1<Z<z2)=P(-2<Z<2)

P(-2<Z<2)=P(-2<Z<0)+P(0<Z<2)

P(-2<Z<2)=0.4772+0.4772

P(-2<Z<2)=0.9544

Thus, About 95% of the area is between z2 and z2

4 0
3 years ago
Construct a quadrilateral ABCD, AB = 4cm BC = 3cm,<br> AD= 2.5cm, AC= 4.5cm, BD= 4cm.
hammer [34]

Answer:

steps below

Step-by-step explanation:

1. use ruler to draw a segment of 4 units AB

2. center the compasses needle at A and draw arc with radius of 5 and intersect with another arc centered at B with radius of 3 at point C

3. center the compasses needle at B and draw arc with radius of 4.5 and intersect with another arc centered at A with radius of 2.5 at point D

4. connect BC, CD and AD to form quadrilateral ABCD

6 0
2 years ago
ANZ Corporation manufactures a product available in two models: ABC, and PQR. Despite the growing popularity of the PQR model, c
Nina [5.8K]

Answer:

The full production costs are:

ABC = $22,900,000

PQR = $1,700,000

Step-by-step explanation:

Traditional costing method is a costing method that allocates or applies overhead based on a particular metric determined by a company. It therefore add both direct cost of production and production overheads absorbed to obtain the full cost of production.

Since production overheads in this question is absorbed on demand sales basis, the full production costs for ABC and PQR can be computed as follows:

ANZ Corporation

Computation of Full Production Costs

<u>Particulars                                      ABC                 PQR     </u>

Sales demand                            <u> 30,000 </u>            <u> 15,000</u>

Cost                                                   $                        $    

Direct cost:

Direct materials cost (w.1)        1,350,000           900,000

Direct labor cost (w.2)            <u>    900,000 </u>        <u>  600,000  </u>

Total direct cost                     22,500,000        1,500,000

Indirect cost:

Production overhead (w.3)   <u>      400,000 </u>         <u>  200,000 </u>

Full production cost           <u>  22,900,000 </u>       <u> 1,700,000 </u>

Workings:

w.1: Computation of direct material cost

Direct material cost = Direct material cost per unit * Sales demand

Therefore;

ABC Direct material cost = $45 * 30,000 = $1,350,000

PQR Direct material cost = $60 * 15,000 = $900,000

w.2: Computation of direct labor cost

Direct labor cost = Direct labor cost per unit * Sales demand

Therefore;

ABC Direct material cost = $30 * 30,000 = $900,000

PQR Direct material cost = $40 * 15,000 = $600,000

w.3: Allocation of production overhead

Production overheads allocated to a model = Production overheads * (Model's Sales Demand / Total Sales demand)

Total Sales demand = 30,000 + 15,000 = 45,000

Therefore, we have:

Production overhead allocated to ABC = $600,000 * (30,000 / 45,000) = $400,000

Production overhead allocated to PQR = $600,000 * (15,000 / 45,000) = $200,000

8 0
3 years ago
Other questions:
  • karen has n decks of cards. each deck has 52 cards in it. using n , write an expression for the total number of cards karen has.
    5·1 answer
  • Super confused definitely need help on this
    13·2 answers
  • Write an equation for a polynomial with all the following features: The Degree is 5. The graph of the Polynomial crosses the ver
    9·1 answer
  • What is 6(5−8v)+12=−54
    8·2 answers
  • Taylin buys 5 ounces of tea leaves for $2.35. At this rate,how much money does she need to buy 12 ounces of tea leaves?​
    13·2 answers
  • What is the equation of the line that passes through the point (-8,5) and has a slope<br> of o?
    5·1 answer
  • the shadow of a man who is 1.80m tall is 3.90 m long. if at the same the shadow of trees is 5.20m long. how tall the tree is?​
    6·1 answer
  • Jayden buys a game for $10.67 and some batteries for $5.14 he pays with a twenty dollar bill estimate how much change he should
    10·1 answer
  • *PLS HELP!!*<br>{The Picture Is In The Attachment}​
    12·1 answer
  • Can anyone tell me the standard form of this parabola equation?
    15·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!