Answer:
The number 10 is the base
Answer:
Therefore, the probability that at least half of them need to wait more than 10 minutes is <em>0.0031</em>.
Step-by-step explanation:
The formula for the probability of an exponential distribution is:
P(x < b) = 1 - e^(b/3)
Using the complement rule, we can determine the probability of a customer having to wait more than 10 minutes, by:
p = P(x > 10)
= 1 - P(x < 10)
= 1 - (1 - e^(-10/10) )
= e⁻¹
= 0.3679
The z-score is the difference in sample size and the population mean, divided by the standard deviation:
z = (p' - p) / √[p(1 - p) / n]
= (0.5 - 0.3679) / √[0.3679(1 - 0.3679) / 100)]
= 2.7393
Therefore, using the probability table, you find that the corresponding probability is:
P(p' ≥ 0.5) = P(z > 2.7393)
<em>P(p' ≥ 0.5) = 0.0031</em>
<em></em>
Therefore, the probability that at least half of them need to wait more than 10 minutes is <em>0.0031</em>.
Answer:
Step-by-step explanation:
Lenny had a rectangular deck that was 12 feet by 14 feet he wants to increase the length and width by the same amount and at 120 square feet to the total area what's the answer
-6x+8 I thinkz thtats the correct answer
Answer:
<h2>40% of the tickets were discount ticket</h2>
Step-by-step explanation:
10/25 are discount tickets
x by 4 to make the denominator 100
40/100
make into percentage
40%