31 hours 57 minutes.
In most jobs, the employees round up so that would make it 32 hours.
32x7.50= 240
If they wanted to be technical you could do 31.57x7.5 and that would make it 236.78
It’s up to you which one you go with
1/6 can be be 4/24, 1/3 can be 8/24, and 1/4 can be 6/24. Add them together and you get 18/24, then do 1 (or 24/24) minus 18/24 which equals 6/24 or 1/4
The point-slope form:

m - slope
(x₁, y₁) - point
The formula of a slope:

We have the points (7, 5) and (-4, -1). Substitute:


You get a number less than 7 when you roll a normal dice.
Certain
You get a six when you roll a normal dice.
Likely
Front page of a newspaper will contain the word and.
Certain
Multiplying an odd number by an odd number gives you an odd number.
Even Chance
The next car you see is not a Rolls Royce.
Likely
It is impossible that Ethan will take a red sweet from bag 4.
It is unlikely that Ethan will take a red sweet from bag 3.
It is an even chance that Ethan will take a red sweet from bag 5.
Answer: 554
Step-by-step explanation:
Formula we use to find the sample size :

Given : Standard deviation : 
Margin of error : E=one quarter hour = 0.25 hour
Two-tailed , Critical value use for 0.95 degree of confidence:
i.e. 
Hence, the required sample size = 554
i.e. 554 executives should be surveyed.