Answer:
C. (-4x^2)+2xy^2+[10x^2y+(-4x^2y)
Step-by-step explanation:
A. [9-4x2) + (-4x2y) + 10x2y] + 2xy2 : in this polynomial the first term is not a like term, then this is incorrect.
B. 10x2y + 2xy2 + [(-4x2) + (-4x2y)] : in this polynomial, the terms that are grouped, are not like terms, then is incorrect.
C. (-4x2) + 2xy2 + [10x2y + (-4x2y)] ; This polynomial is the right answer because the like terms are grouped.
D. [10x2y + 2xy2 + (-4x2y)] + (-4x2): This polynomial is incorrect because one of the terms that are grouped is not a like term.
Answer:
its 11 or its 5
Step-by-step explanation:
For this case we define the following variables:
x: Number of party dresses
y: Number of suits
You have 30 hours per week to cut, that is, the first equation is given by:

It is also known that 25 hours per week are available for sewing, that is:

It has a system of two equations with two unknowns, solving we have:

Multiplying the second equation by -1:

Adding up:

Substituting x in the first equation:

Clearing and:


Thus, per week, the designer can produce 5 party dresses and 5 suits working at her maximum capacity.
Answer:
5 Party dresses
5 Suits
0.0033
This is rounded btw