1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
algol [13]
3 years ago
14

In 2009, __________ accounted for 1,772 total fatalities. A. passengers riding with impaired drivers B. children hit by backing

vehicles C. elderly bicyclists D. impaired drivers
Computers and Technology
2 answers:
Oduvanchick [21]3 years ago
8 0

The answer is <em>A.) Passengers riding with impaired drivers.</em>

inna [77]3 years ago
3 0

Answer:

<u><em>The answer is</em></u>: <u>A. passengers riding with impaired drivers. </u>

Explanation:

Fatalities, by Role, in Crashes Involving at Least One Driver With a BAC of .08  Or Higher, 2009 -

<u>Role Number Percent of Total </u>

1.- Driver With BAC=.08+ 7,281 67%

2.- Passenger Riding w/Driver With BAC=.08+ 1,772 16%

<u>Subtotal</u> 9,053 84%

3.- Occupants of Other Vehicles 1,119 10%

4.- Non Occupants 667 6%

<u>Total Fatalities</u> 10,839 100%

Passenger Riding w/Driver With BAC=.08+ 1,772 16% ç

<u><em>The answer is</em></u>: <u>A. passengers riding with impaired drivers. </u>

You might be interested in
You can use the Ignore All button to ignore the current and all future occurrences of a flagged word. True or False
Pepsi [2]

Answer: True

Explanation: "Ignore All" button is the button that operates when the user wants to ignore the word that is flagged .Flagged words are those which chosen by user to be banned and don't want to use in future.

Ignore all button helps in the ignoring of the spelling check of the words that the user is sure about and the words that user don't want to be the part of their content.This banning is for the future use and current time as well.Thus, the statement is true.

4 0
3 years ago
Your new client's AdWords account has one campaign with one ad group that contains a list of hundreds of keywords. Which best pr
Degger [83]
<span>Create new ad groups with related keywords grouped together</span>
8 0
3 years ago
Find the equation of a line which has 10 points the following two coordinates: (4, 0) and (3, 4)​
alex41 [277]

Answer:

The equation of the line is y = -4·x + 16

10 points on the line include;

(0, 16), (1, 12), (2, 8), (3, 4), (4, 0), (5, -4), (6, -8), (7, 12), (8, -16), (9, -20), and (10, -24)

Explanation:

The given points through which the line passes are;

(4, 0) and (3, 4)

The slope, 'm', of the line is given as follows;

Slope, \, m =\dfrac{y_{2}-y_{1}}{x_{2}-x_{1}}

Therefore, the slope of the line is (4 - 0)/(3 - 4) = -4

In point and slope form we can get;

\dfrac{y-0}{x-4} = -4

The equation of the line in point and slope form is therefore;

y = -4·(x - 4) = -4·x + 16

The equation of the line in slope and intercept form is

y = -4·x + 16

10 points on the line are obtained using the equation of the line and the desired x-values input into cells on MS Excel and presented here as follows;

(0, 16), (1, 12), (2, 8), (3, 4), (4, 0), (5, -4), (6, -8), (7, 12), (8, -16), (9, -20), and (10, -24)

8 0
3 years ago
You have just performed a cpm analysis and have found that more than one path through the project network has zero slack values.
Alex787 [66]

Answer:

There are multiple critical paths

Explanation:

The critical path method (CPM), or critical path analysis (CPA), is an algorithm for scheduling a set of project activities. It is commonly used in conjunction with the program evaluation and review technique (PERT). A critical path is determined by identifying the longest stretch of dependent activities and measuring the time required to complete them from start to finish.

The essential technique for using CPM is to construct a model of the project that includes the following:

  •    A list of all activities required to complete the project (typically categorized within a work breakdown structure),
  •    The time (duration) that each activity will take to complete,
  •    The dependencies between the activities and,
  •    Logical end points such as milestones or deliverable items.      

Using these values, CPM calculates the longest path of planned activities to logical end points or to the end of the project, and the earliest and latest that each activity can start and finish without making the project longer. This process determines which activities are "critical" (i.e., on the longest path) and which have "total float" (i.e., can be delayed without making the project longer).

considering the above function of the cpm analysis because you have multiple path, there is tendency that more than path through the project network will have zero slack values.

5 0
3 years ago
At a local marketing firm, Steve is the lead Web developer and is responsible for working with customers on their Web designs, d
attashe74 [19]

Answer:

All of the above.

Explanation:

Understanding that he must create a unique domain name for each client

Being able to work with HTML

Understanding of the World Wide Web and how hyperlinks work

All of these would be a critical skill Steve must have to be able to perform his job.

6 0
3 years ago
Other questions:
  • The 3 parts of the CPU are
    15·2 answers
  • People use a computer connected to the internet to manage financial accounts
    15·1 answer
  • The shortest compressed format of the ipv6 address 2001:0db8:0000:1470:0000:0000:0000:0200 is
    6·1 answer
  • When Clara accesses the programs and documents on her computer by way of icons, she is said to be employing
    15·1 answer
  • What is the purpose of the Occupational Safety and Health Act?
    7·2 answers
  • What typically happens by default when a file is double clicked in Microsoft Windows?
    9·1 answer
  • Which type of system is used to analyze, evaluate, and integrate the output of other systems?
    5·2 answers
  • Fill in the blank with the correct response.
    6·1 answer
  • HELP ASAP Encoding a video format and then decoding it during playback is one of the functions of MPEG-4 and H.264 file players.
    10·2 answers
  • Should a UDP packet header contain both Sour Port # and Destination Port #?
    7·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!