Answer:
It listens for sound intensity
Explanation:
It listens for the sound intensity and loudness. As the intensity varies the background color changes as well.
Answer:
I am a software engineering student
computers have createed an impact in my life because through computers i work, I do research and many more
<u>Answer:</u>
<em>feetFab1 = int(input(""Enter the value in feet for the 1st piece of fabric: ""))</em>
<em>inchFab1 = int(input(""Enter the value in inches for the 1st piece of fabric: ""))</em>
<em />
<em>feetFab2 = int(input(""Enter the value in feet for the 2nd piece of fabric: ""))</em>
<em>inchFab2 = int(input(""Enter the value in inches for the 2nd piece of fabric: ""))</em>
<em />
<em>feetSum = (feetFab1 + feetFab2)</em>
<em>inchSum = (inchFab1 + inchFab2)</em>
<em />
<em>totalFeet = ((inchSum % 12) + feetSum)</em>
<em>totalInch = (feetSum % 12)</em>
<em>print (""Feet: "" + str(totalFeet) + "". Inches: "" + str(totalInch))</em>
Answer:
3.
Explanation:
Co-authoring in PowerPoint is sharing a presentation and allowing your colleagues to work on it at the same time. This option of co-authoring is available when you share or save your file on OneDrive or SharePoint.
The perk of co-authoring a presentation is that PowerPoint keeps a record of all edits under the name of the author. This keeps the conflicts away.
Therefore, the correct answer is option 3.
Assuming no options are provided, Jeremy would do well to create a weekly progress report, detailing what the company has accomplished during the week, and what remains to be accomplished. The report should be goal-based with defined deadlines, and clear explanations on what has been done and what remains to be done, and should be organized by the various aspects of the project (accounting, marketing, etc). This report will help keep his team conscience of their role within the larger project, what they have accomplished thus far, and what still needs to be done.