<h2>1. Is the number 5 prime, composite,</h2><h2>or neither?</h2><h3>The number 5 is prime since it can only be divided by itself and 1.</h3><h3 /><h3>Hope I helped. :)</h3>
The square feet of landscaping will the two companies carry out that enables them to charge the same amount is 30
What is the total of the landscaping contract for each company?
The total cost of the landscaping contract for each of the two companies is the sum of the fixed consulting fee plus the multiple of variable charge per square foot multiplied by the number of square feet of landscaping
Company A:
Total cost=300+7S
S=square foot
Company B:
Total cost=120+13S
At the point where the square foot are the same they charge the same amount
300+7S=120+13S
300-120=13S-7S
180=6S
S=180/6
S=30 square foot
Find out more about total cost on: brainly.com/question/15686427
#SPJ1
Answer:
Hence the 3.28 %or 2/61 of total work will be done .
Step-by-step explanation:
Given:
The pecan crops are harvested for friday and saturday (2days)
To find :
What fraction these 2 days corresponds to the harvesting days?
Solution;
The pecan crops are growing in America in state of Georgia
and consider that in months of October and November pecan crop becomes mature .
Hence the harvesting period is of 2 months considerably .
The month of October and November days are 31 and 30 .
Hence the Total days of harvesting are 61 days.
In these days total Pecan crops will be harvested.(100% work in 61 days)
Now the farmer harvest for 2 days only .
Required fraction=2/61
=0.0327869
=3.28%
Depending upon the crop field and planting answer will vary
But 3.28 % of total work will be done in 2 days on harvesting
I think the correct answer is b 75
Answer:
Below.
Step-by-step explanation:
If the sum of any 2 sides are less than or equal to the third side then there's no triangle
1. N0 because 4 + 5 < 10
2. YES
3. NO because 2 + 3 = 5.