34 square feet
Explanation:
Cut the shape into two shapes. The bottom will be a square and the top will be a long rectangle.
The area of the rectangle is 18 square feet
(Multiply 9 x 2)
The area of the square is 16 square feet
(Multiply 4 x4)
18 + 16 = 34
MARK BRAINLIESTT
Please! And thank u, trust me, this is the answer
If the baby went to sleep at 9:30 and woke at 2:45.
Then the baby slept 5 hours and 15 minutes.
Just start at 9:30 and skip count 9:30, 10:30, 11:30, 12:30, 1:30, 2:30 that's 5 hours and from 2:30 to 2:45 is 15 minutes.
Hope this helps. :)
The answers are: 90° , 40°, and 50° .
_______________________________________________
Explanation:
_____________________________________________
Angle 1 = 90 .
Angle 2 = 3x + 4
Angle 3 = 4x + 2
____________________
Since all angles in every triangle add up to 180 ;
90 + 3x + 4 + 4x + 2 = 180 ; Solve for "x" ; then solve for "angle 2" and "angle 3". Since it is a "right triangle" ; we know that "angle 1" = 90 degrees.
7x + 96 = 180 ;
Subtract "96" from each side of the equation;
7x + 96 - 96 = 180 - 96 ;
7x = 84 ; Divide each side of the equation by "7" ;
7x / 7 = 84 / 7 ;
x = 12:
So; angle 1 = 90 ;
Angle 2 = 3x + 4 = 3(12) + 4 = 36 + 4 = 40 ;
Angle 3 = 4x + 2 = 4(12) + 2 = 48 + 2 = 50 ;
____________________________________
90 + 40 + 50 =? 180 ? Yes!
____________________________________
Answer: D. 0.860
Step-by-step explanation:
In the table we can see that he rolled the cube 1000 times, and he recorded that 140 of those times he rolled a 5.
Then, the probability of rolling a 5 will be equal to:
P1 = 140/1000 = 0.14
Now, the probabilty of NOT rolling a 5, is equal to the rest of the probabilities, this is:
P2 = 1 - 0.14 = 0.86
then the correct option is D
Answer:
0.55 = 55% probability that the construction job will be completed on time
Step-by-step explanation:
We have these following probabilities:
0.6 probability there is a strike. In this case, 0.35 probability that the construction will be completed on time.
1 - 0.6 = 0.4 probability that is not a strike. In this case, 0.85 probability that the construction will be completed on time.
What is the probability that the construction job will be completed on time?

0.55 = 55% probability that the construction job will be completed on time