The answer is the second option, option B, which is: B. <span>W'(2,8), X'(2,2), Y'(8,2)
</span> The explanation is shown below:
You have the Triangle WXY has coordinates W(1,4), X(1,1), and Y(4,1) and the Triangle of the option B has coordinates W'(2,8), X'(2,2), Y'(8,2). As you can notice, the coordinates of the new triangle are the result of multiply the coordinates of the original triangle by a scale of factor of 2. Therefore, in other words, the Triangle WXY was dilated with a scale of factor of 2.
Answer:
Project A :
NPV : $703,888.64
IRR : 44.882%
Project B:
NPV : $5,241.26
IRR : 49.662%
Project B is more profitable
Step-by-step explanation:
The NPV gives the difference between the present value of cash inflow and cash outflow over a certain period of time.
The Internal rate of return is the discount rate which makes the NPV of an investment 0. It is used to estimate the potential return on an investment. Investments with higher IRR are said to be better than those with lower IRR value.
Using the net present value, (NPV) Calculator, the NPV for project A is : $703,888.64
The IRR of project A is : 44.882%
The NPV for Project B is : $5,241.26
The Internal rate of return (IRR) : 49.662%
From the Internal rate of return value obtained, we can conclude that, project B is more profitable as it has a higher IRR than project A.
The answer to ur question is 20.94395.
The answer is 3 because 1/3 of 3 is 1 and 1/3 of 9 is 3 and 3 times 1 is 3
Answer: 3
Answer:
i) Point B is located at 0.
ii) The two points that are opposite are 5 / 5 and 10 / -5 and 5 / 5, 10 and -5, -10.
iii) Point D is located at 35.
iv) -20 is one tick mark to the left of point A.