Answer:
It will take Machine A 20 additional minutes.
Step-by-step explanation:
First we have get the rate of work per hour, Machine A builds 1/2 of a car per hour, while Machine B builds 1/3 of a car per hour.
Using this we can determine the amount of work that has been done so far in one hour before Machine B broke down:
1/2 + 1/3 = 3/6 + 2/6 = 5/6
Now we can produce an equation accordingly to determine how much time it'll take machine a to finish the job:
5/6 + 1/2x = 1
1/2x = 1/6
x = 1/3 hours = 20 minutes
Note: In the question you typed "how much additional time will it take machine b to finish" but I think you meant machine a because machine b broke down. Please correct me if I'm wrong.
Hope this helps! And let me know if you have any questions!
A. 12*x + 2*y = 90
6*x + 2*y = 60
To write system of equation you just need to sum all solo and ensemble acts and make it equal to how much they will last for.
B. Here we can multiply second equation with negative 1 and add it to first equation.
6x = 30
x = 5
now we replace x in any of 2 equations to get y.
30+2y = 60
2y = 30
y=15
Solo acts are 5 minutes long and ensemble acts are 15 minutes long
Answer: m=3/2
Step-by-step explanation: the slope starts from the left side and the line is going up meaning its positive, now the line is going up by 3s and to the right in 2s.
Answer:
x = 20°
y = 70°
Step-by-step explanation:
the angle adjacent to the 40° angle must be 140° because the two angles form a straight line (which contains 180°)
in the isosceles triangle with the 'x', that means the other two angles must be equal and are (180-140) ÷ 2, which equals 20°
to find 'y', consider the larger right triangle with angles of 90° and 20°; angle y must equal 180 - (90 + 20) = 70°