Answer:
Option C) 146.5
Step-by-step explanation:
We are given the following information in the question:
Mean, μ = 130 weeks
Standard Deviation, σ = 10 weeks
We are given that the distribution of completion time is a bell shaped distribution that is a normal distribution.
Formula:

P(X<x) = 0.95
We have to find the value of x such that the probability is 0.95
P(X < x)
Calculation the value from standard normal z table, we have,

The project should be completed in 146.5 weeks or less.
Hence, 146.5 weeks should be set the due date such that there is a 95 percent chance that the project will be finished by this time.
Answer:
3/2
Step-by-step explanation:
Recall that slope is y2 - y1 / x2 - x1.
Excellent. The question provides us with two points: (2,4) and (0,1). We can insert these two points into our equation.
Slope = (4 - 1) / (2 - 0) = 3 / 2.
Hope this helps!
Answer:
B
Step-by-step explanation:
slope equals 1 and y-int equals 5